Given an unrealistic project during probationWhat to do when remote project manager isn't managing but still assuring his boss everything is ok?Deadline getting closer, still waiting for others to finishHow to handle unrealistic expectations from managementHow to respond to a boss with unrealistic expectationsProbation extension was notified verbally rather than in writingProject I was hired for is off the rails due to constantly changing requirements, now it's me on the spotQuitting during probation period

Is mathematics truth?

How were the names on the memorial stones in Avengers: Endgame chosen, out-of-universe?

What is the source of the fear in the Hallow spell's extra Fear effect?

Why are all volatile liquids combustible

Fantasy Military Arms and Armor: the Dwarven Grand Armory

Is it risky to move from broad geographical diversification into investing mostly in less developed markets?

How do German speakers decide what should be on the left side of the verb?

Draw the ☣ (Biohazard Symbol)

Life post thesis submission is terrifying - Help!

Why does the UK Prime Minister need the permission of Parliament to call a general election?

Round away from zero

Numerical minimum of a one-valued function

Does POSIX guarantee the paths to any standard utilities?

How can I oppose my advisor granting gift authorship to a collaborator?

Was Rosie the Riveter sourced from a Michelangelo painting?

Are there mathematical concepts that exist in the fourth dimension, but not in the third dimension?

Is Sanskrit really the mother of all languages?

How could a planet have one hemisphere way warmer than the other without the planet being tidally locked?

Bidirectional Dictionary

Mute single speaker?

Why does the std::find for vector return a iterator instead of the integer position

Tying double knot of garbarge bag

How do I make my fill-in-the-blank exercise more obvious?

Is directly echoing the user agent in PHP a security hole?



Given an unrealistic project during probation


What to do when remote project manager isn't managing but still assuring his boss everything is ok?Deadline getting closer, still waiting for others to finishHow to handle unrealistic expectations from managementHow to respond to a boss with unrealistic expectationsProbation extension was notified verbally rather than in writingProject I was hired for is off the rails due to constantly changing requirements, now it's me on the spotQuitting during probation period






.everyoneloves__top-leaderboard:empty,.everyoneloves__mid-leaderboard:empty,.everyoneloves__bot-mid-leaderboard:empty margin-bottom:0;








0















I have been working at a health dept. for almost 5 years. During that time, I got promoted twice (held 3 positions). My most recent one was about 4 months ago and I'm still on probation (I got a mini review at 2 months with high ratings). I have had numerous staff and my manager speak highly of my work in the previous positions and so they have encouraged me to move up again. In this newer position, I have been given a project where I perceive as unrealistic. It involves programming at a higher level than what I know (programming was preferred but not required for the job). The project is due in a month, and even if I worked on this every day and set aside my other 4 projects, I probably wouldn't finish it and will have errors given my lack of advanced expertise. I have been told to use other staff as support. But here are my thoughts:



  1. I could do my best to write the code, bug the hell out of other staff for help, and submit what I have for review- it will likely need to be finished by someone more proficient and mistakes corrected otherwise it won't be submitted by the deadline;


  2. Does it make more sense for a proficient programmer to take this on instead of having him as a support role? Otherwise what I fear is that I'm told my code isn't finished/needs corrections and may need to be revamped with only days to spare before the deadline.


I'm thinking of talking to my seniors individually followed by my manager about my concerns (it's likely that the manager will pull in the seniors to the office so I don't want this to be a surprise for them). At this point, I'm ready to say if I don't live up to the expectation, I will resign- it's not the work environment I want to be in. However, I'm almost sure they will want to hang on to me given my previous success. Any thoughts or ideas appreciated.










share|improve this question







New contributor



vegan_renegade is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
Check out our Code of Conduct.



























    0















    I have been working at a health dept. for almost 5 years. During that time, I got promoted twice (held 3 positions). My most recent one was about 4 months ago and I'm still on probation (I got a mini review at 2 months with high ratings). I have had numerous staff and my manager speak highly of my work in the previous positions and so they have encouraged me to move up again. In this newer position, I have been given a project where I perceive as unrealistic. It involves programming at a higher level than what I know (programming was preferred but not required for the job). The project is due in a month, and even if I worked on this every day and set aside my other 4 projects, I probably wouldn't finish it and will have errors given my lack of advanced expertise. I have been told to use other staff as support. But here are my thoughts:



    1. I could do my best to write the code, bug the hell out of other staff for help, and submit what I have for review- it will likely need to be finished by someone more proficient and mistakes corrected otherwise it won't be submitted by the deadline;


    2. Does it make more sense for a proficient programmer to take this on instead of having him as a support role? Otherwise what I fear is that I'm told my code isn't finished/needs corrections and may need to be revamped with only days to spare before the deadline.


    I'm thinking of talking to my seniors individually followed by my manager about my concerns (it's likely that the manager will pull in the seniors to the office so I don't want this to be a surprise for them). At this point, I'm ready to say if I don't live up to the expectation, I will resign- it's not the work environment I want to be in. However, I'm almost sure they will want to hang on to me given my previous success. Any thoughts or ideas appreciated.










    share|improve this question







    New contributor



    vegan_renegade is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
    Check out our Code of Conduct.























      0












      0








      0








      I have been working at a health dept. for almost 5 years. During that time, I got promoted twice (held 3 positions). My most recent one was about 4 months ago and I'm still on probation (I got a mini review at 2 months with high ratings). I have had numerous staff and my manager speak highly of my work in the previous positions and so they have encouraged me to move up again. In this newer position, I have been given a project where I perceive as unrealistic. It involves programming at a higher level than what I know (programming was preferred but not required for the job). The project is due in a month, and even if I worked on this every day and set aside my other 4 projects, I probably wouldn't finish it and will have errors given my lack of advanced expertise. I have been told to use other staff as support. But here are my thoughts:



      1. I could do my best to write the code, bug the hell out of other staff for help, and submit what I have for review- it will likely need to be finished by someone more proficient and mistakes corrected otherwise it won't be submitted by the deadline;


      2. Does it make more sense for a proficient programmer to take this on instead of having him as a support role? Otherwise what I fear is that I'm told my code isn't finished/needs corrections and may need to be revamped with only days to spare before the deadline.


      I'm thinking of talking to my seniors individually followed by my manager about my concerns (it's likely that the manager will pull in the seniors to the office so I don't want this to be a surprise for them). At this point, I'm ready to say if I don't live up to the expectation, I will resign- it's not the work environment I want to be in. However, I'm almost sure they will want to hang on to me given my previous success. Any thoughts or ideas appreciated.










      share|improve this question







      New contributor



      vegan_renegade is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
      Check out our Code of Conduct.











      I have been working at a health dept. for almost 5 years. During that time, I got promoted twice (held 3 positions). My most recent one was about 4 months ago and I'm still on probation (I got a mini review at 2 months with high ratings). I have had numerous staff and my manager speak highly of my work in the previous positions and so they have encouraged me to move up again. In this newer position, I have been given a project where I perceive as unrealistic. It involves programming at a higher level than what I know (programming was preferred but not required for the job). The project is due in a month, and even if I worked on this every day and set aside my other 4 projects, I probably wouldn't finish it and will have errors given my lack of advanced expertise. I have been told to use other staff as support. But here are my thoughts:



      1. I could do my best to write the code, bug the hell out of other staff for help, and submit what I have for review- it will likely need to be finished by someone more proficient and mistakes corrected otherwise it won't be submitted by the deadline;


      2. Does it make more sense for a proficient programmer to take this on instead of having him as a support role? Otherwise what I fear is that I'm told my code isn't finished/needs corrections and may need to be revamped with only days to spare before the deadline.


      I'm thinking of talking to my seniors individually followed by my manager about my concerns (it's likely that the manager will pull in the seniors to the office so I don't want this to be a surprise for them). At this point, I'm ready to say if I don't live up to the expectation, I will resign- it's not the work environment I want to be in. However, I'm almost sure they will want to hang on to me given my previous success. Any thoughts or ideas appreciated.







      management new-job project-management probation projects






      share|improve this question







      New contributor



      vegan_renegade is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
      Check out our Code of Conduct.










      share|improve this question







      New contributor



      vegan_renegade is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
      Check out our Code of Conduct.








      share|improve this question




      share|improve this question






      New contributor



      vegan_renegade is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
      Check out our Code of Conduct.








      asked 13 mins ago









      vegan_renegadevegan_renegade

      1




      1




      New contributor



      vegan_renegade is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
      Check out our Code of Conduct.




      New contributor




      vegan_renegade is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
      Check out our Code of Conduct.

























          0






          active

          oldest

          votes














          Your Answer








          StackExchange.ready(function()
          var channelOptions =
          tags: "".split(" "),
          id: "423"
          ;
          initTagRenderer("".split(" "), "".split(" "), channelOptions);

          StackExchange.using("externalEditor", function()
          // Have to fire editor after snippets, if snippets enabled
          if (StackExchange.settings.snippets.snippetsEnabled)
          StackExchange.using("snippets", function()
          createEditor();
          );

          else
          createEditor();

          );

          function createEditor()
          StackExchange.prepareEditor(
          heartbeatType: 'answer',
          autoActivateHeartbeat: false,
          convertImagesToLinks: false,
          noModals: true,
          showLowRepImageUploadWarning: true,
          reputationToPostImages: null,
          bindNavPrevention: true,
          postfix: "",
          imageUploader:
          brandingHtml: "Powered by u003ca class="icon-imgur-white" href="https://imgur.com/"u003eu003c/au003e",
          contentPolicyHtml: "User contributions licensed under u003ca href="https://creativecommons.org/licenses/by-sa/3.0/"u003ecc by-sa 3.0 with attribution requiredu003c/au003e u003ca href="https://stackoverflow.com/legal/content-policy"u003e(content policy)u003c/au003e",
          allowUrls: true
          ,
          noCode: true, onDemand: true,
          discardSelector: ".discard-answer"
          ,immediatelyShowMarkdownHelp:true
          );



          );






          vegan_renegade is a new contributor. Be nice, and check out our Code of Conduct.









          draft saved

          draft discarded


















          StackExchange.ready(
          function ()
          StackExchange.openid.initPostLogin('.new-post-login', 'https%3a%2f%2fworkplace.stackexchange.com%2fquestions%2f143511%2fgiven-an-unrealistic-project-during-probation%23new-answer', 'question_page');

          );

          Post as a guest















          Required, but never shown

























          0






          active

          oldest

          votes








          0






          active

          oldest

          votes









          active

          oldest

          votes






          active

          oldest

          votes








          vegan_renegade is a new contributor. Be nice, and check out our Code of Conduct.









          draft saved

          draft discarded


















          vegan_renegade is a new contributor. Be nice, and check out our Code of Conduct.












          vegan_renegade is a new contributor. Be nice, and check out our Code of Conduct.











          vegan_renegade is a new contributor. Be nice, and check out our Code of Conduct.














          Thanks for contributing an answer to The Workplace Stack Exchange!


          • Please be sure to answer the question. Provide details and share your research!

          But avoid


          • Asking for help, clarification, or responding to other answers.

          • Making statements based on opinion; back them up with references or personal experience.

          To learn more, see our tips on writing great answers.




          draft saved


          draft discarded














          StackExchange.ready(
          function ()
          StackExchange.openid.initPostLogin('.new-post-login', 'https%3a%2f%2fworkplace.stackexchange.com%2fquestions%2f143511%2fgiven-an-unrealistic-project-during-probation%23new-answer', 'question_page');

          );

          Post as a guest















          Required, but never shown





















































          Required, but never shown














          Required, but never shown












          Required, but never shown







          Required, but never shown

































          Required, but never shown














          Required, but never shown












          Required, but never shown







          Required, but never shown







          Popular posts from this blog

          Invision Community Contents History See also References External links Navigation menuProprietaryinvisioncommunity.comIPS Community ForumsIPS Community Forumsthis blog entry"License Changes, IP.Board 3.4, and the Future""Interview -- Matt Mecham of Ibforums""CEO Invision Power Board, Matt Mecham Is a Liar, Thief!"IPB License Explanation 1.3, 1.3.1, 2.0, and 2.1ArchivedSecurity Fixes, Updates And Enhancements For IPB 1.3.1Archived"New Demo Accounts - Invision Power Services"the original"New Default Skin"the original"Invision Power Board 3.0.0 and Applications Released"the original"Archived copy"the original"Perpetual licenses being done away with""Release Notes - Invision Power Services""Introducing: IPS Community Suite 4!"Invision Community Release Notes

          Canceling a color specificationRandomly assigning color to Graphics3D objects?Default color for Filling in Mathematica 9Coloring specific elements of sets with a prime modified order in an array plotHow to pick a color differing significantly from the colors already in a given color list?Detection of the text colorColor numbers based on their valueCan color schemes for use with ColorData include opacity specification?My dynamic color schemes

          Ласкавець круглолистий Зміст Опис | Поширення | Галерея | Примітки | Посилання | Навігаційне меню58171138361-22960890446Bupleurum rotundifoliumEuro+Med PlantbasePlants of the World Online — Kew ScienceGermplasm Resources Information Network (GRIN)Ласкавецькн. VI : Літери Ком — Левиправивши або дописавши її