What is the Process for Re-certifying Flight Hardware?Why use water tanks from a retired Space Shuttle?What is the purpose of the Dream Chaser carry test?Falcon 9 1.1 demo flight (flight 6) - Was the second stage burn meant to test deorbit?Through what mechanisms would SpaceX test and examine the returned CRS-5 first stage?Does every liquid-fueled rocket engine get a test run before its actual flight operation?What will the Falcon Heavy maiden flight launch as its payload?Why is there any launch window at all for the Falcon Heavy test flight?Testing flight characteristics before actual flight in model rockets?What is the surrogate liquid for LOx during the preliminary testing of injectors?Why is a purging process necessary for static firing test of liquid rocket engines?Purging process of a rocket engine

How to detach yourself from a character you're going to kill?

Will TSA allow me to carry a Continuous Positive Airway Pressure (CPAP) device?

Beginner's snake game using PyGame

Are there practical reasons to NOT use a stepper motor with lead screw for the X and or Y axes?

Did thousands of women die every year due to illegal abortions before Roe v. Wade?

Is there any Biblical Basis for 400 years of silence between Old and New Testament?

Is it possible to kill all life on Earth?

Is having a hidden directory under /etc safe?

Sucuri detects malware on wordpress but I can't find the malicious code

Humans meet a distant alien species. How do they standardize? - Units of Measure

Please help me identify this plane

Will dual-learning in a glider make my airplane learning safer?

Is it a problem that pull requests are approved without any comments

Unorthodox way of solving Einstein field equations

How to apply the "glow" effect to a rectangle with tcolorbox?

Concise way to draw this pyramid

Is it legal in the UK for politicians to lie to the public for political gain?

Movie where a boy is transported into the future by an alien spaceship

Can The Malloreon be read without first reading The Belgariad?

Hygienic footwear for prehensile feet?

Short story written from alien perspective with this line: "It's too bright to look at, so they don't"

Working in the USA for living expenses only; allowed on VWP?

Metal bar on DMM PCB

What people are called boars ("кабан") and why?



What is the Process for Re-certifying Flight Hardware?


Why use water tanks from a retired Space Shuttle?What is the purpose of the Dream Chaser carry test?Falcon 9 1.1 demo flight (flight 6) - Was the second stage burn meant to test deorbit?Through what mechanisms would SpaceX test and examine the returned CRS-5 first stage?Does every liquid-fueled rocket engine get a test run before its actual flight operation?What will the Falcon Heavy maiden flight launch as its payload?Why is there any launch window at all for the Falcon Heavy test flight?Testing flight characteristics before actual flight in model rockets?What is the surrogate liquid for LOx during the preliminary testing of injectors?Why is a purging process necessary for static firing test of liquid rocket engines?Purging process of a rocket engine













3












$begingroup$


I was reading about how we reused the water tanks because they were still within their certified life-time and had two questions:



  • When would a certification become VOID?

    • I'd assume if the water tanks accidentally took a fall they'd not be certified still.

    • What are some other examples of events that can void a certification?


  • When an event occurs altering the suitability of flight hardware how is it re-certified?

    • I'd assume there's some sort of inspection, could someone outline what it'd be?

    • You may use the example of the water tanks being dropped, what would NASA do?


You may also consider the toppled NOA satellite as a case study too if you wish. I'd like to know what all they had to do to consider it as "certified" again after the incident.










share|improve this question









$endgroup$
















    3












    $begingroup$


    I was reading about how we reused the water tanks because they were still within their certified life-time and had two questions:



    • When would a certification become VOID?

      • I'd assume if the water tanks accidentally took a fall they'd not be certified still.

      • What are some other examples of events that can void a certification?


    • When an event occurs altering the suitability of flight hardware how is it re-certified?

      • I'd assume there's some sort of inspection, could someone outline what it'd be?

      • You may use the example of the water tanks being dropped, what would NASA do?


    You may also consider the toppled NOA satellite as a case study too if you wish. I'd like to know what all they had to do to consider it as "certified" again after the incident.










    share|improve this question









    $endgroup$














      3












      3








      3





      $begingroup$


      I was reading about how we reused the water tanks because they were still within their certified life-time and had two questions:



      • When would a certification become VOID?

        • I'd assume if the water tanks accidentally took a fall they'd not be certified still.

        • What are some other examples of events that can void a certification?


      • When an event occurs altering the suitability of flight hardware how is it re-certified?

        • I'd assume there's some sort of inspection, could someone outline what it'd be?

        • You may use the example of the water tanks being dropped, what would NASA do?


      You may also consider the toppled NOA satellite as a case study too if you wish. I'd like to know what all they had to do to consider it as "certified" again after the incident.










      share|improve this question









      $endgroup$




      I was reading about how we reused the water tanks because they were still within their certified life-time and had two questions:



      • When would a certification become VOID?

        • I'd assume if the water tanks accidentally took a fall they'd not be certified still.

        • What are some other examples of events that can void a certification?


      • When an event occurs altering the suitability of flight hardware how is it re-certified?

        • I'd assume there's some sort of inspection, could someone outline what it'd be?

        • You may use the example of the water tanks being dropped, what would NASA do?


      You may also consider the toppled NOA satellite as a case study too if you wish. I'd like to know what all they had to do to consider it as "certified" again after the incident.







      reuse testing






      share|improve this question













      share|improve this question











      share|improve this question




      share|improve this question










      asked 8 hours ago









      Magic Octopus UrnMagic Octopus Urn

      3,49011550




      3,49011550




















          1 Answer
          1






          active

          oldest

          votes


















          6












          $begingroup$

          From what I've observed, the general process works like this:



          1. A Non-Conformance Report (NCR) is generated. These are applicable for everything from an unexpected scratch or tool mark on a surface to a system-level failure. The NCR identifies the "is" vs. "should be" state of a component.


          2. A Material Review Board (MRB) convenes. This is a group of engineers and managers who make decisions in a structured way regarding NCRs. From here, it's case-dependent. It may involve specific analysis, or it may just be a series of discussions. It all depends on the specific nonconformance.



          3. The NCR is dispositioned. Again, case dependent. The disposition is determined by the MRB. Typical disposition outcomes:




            • Use as is. Analysis shows the nonconformance does not affect safety or mission success -- no corrective action is necessary to certify the part for flight.


            • Rework the part. Case dependent. Could be as simple as redrilling a hole in the right location, buffing out scratches, etc.


            • Use as is, issue drawing rev. In the case of a misdrilled hole, for example, create a drawing rev showing where the hole was drilled so that there is traceability between the drawing and what was manufactured.


            • Scrap. The component is too far gone. Toss it out and build a new one. Depending on the source of the NCR, it may be a build to print, or there may be a redesign.






          share|improve this answer









          $endgroup$












          • $begingroup$
            +1, A couple of things to add: A) the MRB is usually given total authority over the future of the part and may direct the project office to examine, test, repair etc. B) there is usually a distinction drawn between "re-work" such as your first example and "repair" which is closer to your second example of buffing to remove a scratch. The difference lies in that "re-work" is re-application of the same processes used in the original build whereas "repair" uses additional (authorised) processes that were not needed for an original build.
            $endgroup$
            – Puffin
            4 hours ago











          Your Answer








          StackExchange.ready(function()
          var channelOptions =
          tags: "".split(" "),
          id: "508"
          ;
          initTagRenderer("".split(" "), "".split(" "), channelOptions);

          StackExchange.using("externalEditor", function()
          // Have to fire editor after snippets, if snippets enabled
          if (StackExchange.settings.snippets.snippetsEnabled)
          StackExchange.using("snippets", function()
          createEditor();
          );

          else
          createEditor();

          );

          function createEditor()
          StackExchange.prepareEditor(
          heartbeatType: 'answer',
          autoActivateHeartbeat: false,
          convertImagesToLinks: false,
          noModals: true,
          showLowRepImageUploadWarning: true,
          reputationToPostImages: null,
          bindNavPrevention: true,
          postfix: "",
          imageUploader:
          brandingHtml: "Powered by u003ca class="icon-imgur-white" href="https://imgur.com/"u003eu003c/au003e",
          contentPolicyHtml: "User contributions licensed under u003ca href="https://creativecommons.org/licenses/by-sa/3.0/"u003ecc by-sa 3.0 with attribution requiredu003c/au003e u003ca href="https://stackoverflow.com/legal/content-policy"u003e(content policy)u003c/au003e",
          allowUrls: true
          ,
          noCode: true, onDemand: true,
          discardSelector: ".discard-answer"
          ,immediatelyShowMarkdownHelp:true
          );



          );













          draft saved

          draft discarded


















          StackExchange.ready(
          function ()
          StackExchange.openid.initPostLogin('.new-post-login', 'https%3a%2f%2fspace.stackexchange.com%2fquestions%2f36486%2fwhat-is-the-process-for-re-certifying-flight-hardware%23new-answer', 'question_page');

          );

          Post as a guest















          Required, but never shown

























          1 Answer
          1






          active

          oldest

          votes








          1 Answer
          1






          active

          oldest

          votes









          active

          oldest

          votes






          active

          oldest

          votes









          6












          $begingroup$

          From what I've observed, the general process works like this:



          1. A Non-Conformance Report (NCR) is generated. These are applicable for everything from an unexpected scratch or tool mark on a surface to a system-level failure. The NCR identifies the "is" vs. "should be" state of a component.


          2. A Material Review Board (MRB) convenes. This is a group of engineers and managers who make decisions in a structured way regarding NCRs. From here, it's case-dependent. It may involve specific analysis, or it may just be a series of discussions. It all depends on the specific nonconformance.



          3. The NCR is dispositioned. Again, case dependent. The disposition is determined by the MRB. Typical disposition outcomes:




            • Use as is. Analysis shows the nonconformance does not affect safety or mission success -- no corrective action is necessary to certify the part for flight.


            • Rework the part. Case dependent. Could be as simple as redrilling a hole in the right location, buffing out scratches, etc.


            • Use as is, issue drawing rev. In the case of a misdrilled hole, for example, create a drawing rev showing where the hole was drilled so that there is traceability between the drawing and what was manufactured.


            • Scrap. The component is too far gone. Toss it out and build a new one. Depending on the source of the NCR, it may be a build to print, or there may be a redesign.






          share|improve this answer









          $endgroup$












          • $begingroup$
            +1, A couple of things to add: A) the MRB is usually given total authority over the future of the part and may direct the project office to examine, test, repair etc. B) there is usually a distinction drawn between "re-work" such as your first example and "repair" which is closer to your second example of buffing to remove a scratch. The difference lies in that "re-work" is re-application of the same processes used in the original build whereas "repair" uses additional (authorised) processes that were not needed for an original build.
            $endgroup$
            – Puffin
            4 hours ago















          6












          $begingroup$

          From what I've observed, the general process works like this:



          1. A Non-Conformance Report (NCR) is generated. These are applicable for everything from an unexpected scratch or tool mark on a surface to a system-level failure. The NCR identifies the "is" vs. "should be" state of a component.


          2. A Material Review Board (MRB) convenes. This is a group of engineers and managers who make decisions in a structured way regarding NCRs. From here, it's case-dependent. It may involve specific analysis, or it may just be a series of discussions. It all depends on the specific nonconformance.



          3. The NCR is dispositioned. Again, case dependent. The disposition is determined by the MRB. Typical disposition outcomes:




            • Use as is. Analysis shows the nonconformance does not affect safety or mission success -- no corrective action is necessary to certify the part for flight.


            • Rework the part. Case dependent. Could be as simple as redrilling a hole in the right location, buffing out scratches, etc.


            • Use as is, issue drawing rev. In the case of a misdrilled hole, for example, create a drawing rev showing where the hole was drilled so that there is traceability between the drawing and what was manufactured.


            • Scrap. The component is too far gone. Toss it out and build a new one. Depending on the source of the NCR, it may be a build to print, or there may be a redesign.






          share|improve this answer









          $endgroup$












          • $begingroup$
            +1, A couple of things to add: A) the MRB is usually given total authority over the future of the part and may direct the project office to examine, test, repair etc. B) there is usually a distinction drawn between "re-work" such as your first example and "repair" which is closer to your second example of buffing to remove a scratch. The difference lies in that "re-work" is re-application of the same processes used in the original build whereas "repair" uses additional (authorised) processes that were not needed for an original build.
            $endgroup$
            – Puffin
            4 hours ago













          6












          6








          6





          $begingroup$

          From what I've observed, the general process works like this:



          1. A Non-Conformance Report (NCR) is generated. These are applicable for everything from an unexpected scratch or tool mark on a surface to a system-level failure. The NCR identifies the "is" vs. "should be" state of a component.


          2. A Material Review Board (MRB) convenes. This is a group of engineers and managers who make decisions in a structured way regarding NCRs. From here, it's case-dependent. It may involve specific analysis, or it may just be a series of discussions. It all depends on the specific nonconformance.



          3. The NCR is dispositioned. Again, case dependent. The disposition is determined by the MRB. Typical disposition outcomes:




            • Use as is. Analysis shows the nonconformance does not affect safety or mission success -- no corrective action is necessary to certify the part for flight.


            • Rework the part. Case dependent. Could be as simple as redrilling a hole in the right location, buffing out scratches, etc.


            • Use as is, issue drawing rev. In the case of a misdrilled hole, for example, create a drawing rev showing where the hole was drilled so that there is traceability between the drawing and what was manufactured.


            • Scrap. The component is too far gone. Toss it out and build a new one. Depending on the source of the NCR, it may be a build to print, or there may be a redesign.






          share|improve this answer









          $endgroup$



          From what I've observed, the general process works like this:



          1. A Non-Conformance Report (NCR) is generated. These are applicable for everything from an unexpected scratch or tool mark on a surface to a system-level failure. The NCR identifies the "is" vs. "should be" state of a component.


          2. A Material Review Board (MRB) convenes. This is a group of engineers and managers who make decisions in a structured way regarding NCRs. From here, it's case-dependent. It may involve specific analysis, or it may just be a series of discussions. It all depends on the specific nonconformance.



          3. The NCR is dispositioned. Again, case dependent. The disposition is determined by the MRB. Typical disposition outcomes:




            • Use as is. Analysis shows the nonconformance does not affect safety or mission success -- no corrective action is necessary to certify the part for flight.


            • Rework the part. Case dependent. Could be as simple as redrilling a hole in the right location, buffing out scratches, etc.


            • Use as is, issue drawing rev. In the case of a misdrilled hole, for example, create a drawing rev showing where the hole was drilled so that there is traceability between the drawing and what was manufactured.


            • Scrap. The component is too far gone. Toss it out and build a new one. Depending on the source of the NCR, it may be a build to print, or there may be a redesign.







          share|improve this answer












          share|improve this answer



          share|improve this answer










          answered 8 hours ago









          TristanTristan

          11.5k13858




          11.5k13858











          • $begingroup$
            +1, A couple of things to add: A) the MRB is usually given total authority over the future of the part and may direct the project office to examine, test, repair etc. B) there is usually a distinction drawn between "re-work" such as your first example and "repair" which is closer to your second example of buffing to remove a scratch. The difference lies in that "re-work" is re-application of the same processes used in the original build whereas "repair" uses additional (authorised) processes that were not needed for an original build.
            $endgroup$
            – Puffin
            4 hours ago
















          • $begingroup$
            +1, A couple of things to add: A) the MRB is usually given total authority over the future of the part and may direct the project office to examine, test, repair etc. B) there is usually a distinction drawn between "re-work" such as your first example and "repair" which is closer to your second example of buffing to remove a scratch. The difference lies in that "re-work" is re-application of the same processes used in the original build whereas "repair" uses additional (authorised) processes that were not needed for an original build.
            $endgroup$
            – Puffin
            4 hours ago















          $begingroup$
          +1, A couple of things to add: A) the MRB is usually given total authority over the future of the part and may direct the project office to examine, test, repair etc. B) there is usually a distinction drawn between "re-work" such as your first example and "repair" which is closer to your second example of buffing to remove a scratch. The difference lies in that "re-work" is re-application of the same processes used in the original build whereas "repair" uses additional (authorised) processes that were not needed for an original build.
          $endgroup$
          – Puffin
          4 hours ago




          $begingroup$
          +1, A couple of things to add: A) the MRB is usually given total authority over the future of the part and may direct the project office to examine, test, repair etc. B) there is usually a distinction drawn between "re-work" such as your first example and "repair" which is closer to your second example of buffing to remove a scratch. The difference lies in that "re-work" is re-application of the same processes used in the original build whereas "repair" uses additional (authorised) processes that were not needed for an original build.
          $endgroup$
          – Puffin
          4 hours ago

















          draft saved

          draft discarded
















































          Thanks for contributing an answer to Space Exploration Stack Exchange!


          • Please be sure to answer the question. Provide details and share your research!

          But avoid


          • Asking for help, clarification, or responding to other answers.

          • Making statements based on opinion; back them up with references or personal experience.

          Use MathJax to format equations. MathJax reference.


          To learn more, see our tips on writing great answers.




          draft saved


          draft discarded














          StackExchange.ready(
          function ()
          StackExchange.openid.initPostLogin('.new-post-login', 'https%3a%2f%2fspace.stackexchange.com%2fquestions%2f36486%2fwhat-is-the-process-for-re-certifying-flight-hardware%23new-answer', 'question_page');

          );

          Post as a guest















          Required, but never shown





















































          Required, but never shown














          Required, but never shown












          Required, but never shown







          Required, but never shown

































          Required, but never shown














          Required, but never shown












          Required, but never shown







          Required, but never shown







          Popular posts from this blog

          Canceling a color specificationRandomly assigning color to Graphics3D objects?Default color for Filling in Mathematica 9Coloring specific elements of sets with a prime modified order in an array plotHow to pick a color differing significantly from the colors already in a given color list?Detection of the text colorColor numbers based on their valueCan color schemes for use with ColorData include opacity specification?My dynamic color schemes

          Invision Community Contents History See also References External links Navigation menuProprietaryinvisioncommunity.comIPS Community ForumsIPS Community Forumsthis blog entry"License Changes, IP.Board 3.4, and the Future""Interview -- Matt Mecham of Ibforums""CEO Invision Power Board, Matt Mecham Is a Liar, Thief!"IPB License Explanation 1.3, 1.3.1, 2.0, and 2.1ArchivedSecurity Fixes, Updates And Enhancements For IPB 1.3.1Archived"New Demo Accounts - Invision Power Services"the original"New Default Skin"the original"Invision Power Board 3.0.0 and Applications Released"the original"Archived copy"the original"Perpetual licenses being done away with""Release Notes - Invision Power Services""Introducing: IPS Community Suite 4!"Invision Community Release Notes

          199年 目錄 大件事 到箇年出世嗰人 到箇年死嗰人 節慶、風俗習慣 導覽選單